Baseball for Ely’s American Legion team this weekend so far: ‏   http://elylegionbaseball.blogspot.com/2013/07/ely-reaches-district-finals.html?spref=tw  http://huismanconcepts.com/

To continue from last weeks post:The next steps are filling in and compacting the inside area under the basement slab and then laying the foam insulation that will force the heat from the in-floor heating system up into the house. Here the dirt is being brought in to the inside of the footings and compacted. … Read more

A day at the park

…a fun day at the park yesterday. A small group of volunteers under the direction of Bill Tefft, spent a good chunk of the day installing the long awaited paver paths in Whiteside park by the playground area. The paver product is Azek. It is a really cool recycled plastic product available at Voyageur Lumber … Read more

Completed granite counter top job

This is the new granite counter-top install I posted about a few weeks ago…The appliances and plumbing fixtures are in place. The job is completed.  Here are other pictures of the house:http://huismanconcepts.com/custom-home-gallery/cedar-and-stone-cabin/ ____________________________ ________________________ http://huismanconcepts.com/

Custom made arched screen doors

I spent the day this past Friday driving to Minneapolis to deliver and install some screen doors to go with the arched oak doors that I built last year. Here are the Oak doors I built last year: Here they are with the screen doors installed: __________________________ _____________ http://huismanconcepts.com/