Timber frame progress…

Slow progress on the Timber frame project… the structural insulated panels, (SIPs), have finally arrived. They took a lot longer to get than I had anticipated.A SIP is basically an inside and an outside layer of OSB, (oriented strand board), with foam insulation sandwiched between. They are commonly used, as in this case, as a … Read more

a bridge…

We had a slight dusting of snow this morning on the decks and roofs and cars.A hint of what is to come weather we need it or not.It turned out to be a very nice day, high about 40 degrees and enough sun to be pleasant. This is a little bridge over a small creek … Read more

Ely island cabin progress

The little island cabin is progressing nicely. The windows have been installed and the house wrap put up. It is ready for roofing and siding. The deck is framed and ready for the cedar decking to be installed. _____________________________ _____________________________________ ______________________ http://huismanconcepts.com/ Anyone who has lived in Ely for any length of time realizes very … Read more

the simple island cabin

a couple weeks after the footings were ready, the walls and subfloor have been framed up and sheeted… We have been having some beautiful September weather: Here is the architects rendering of the cabin… it should look something like this when it’s done: http://huismanconcepts.com/

back to the island project

Back to the small cabin project on the Island, footing piers are in at the building site: Now floor framing can begin and then walls… http://huismanconcepts.com/ ______________________________ _______________________________________ _________________ This is a great editorial in the Ely Timberjay this past week:  http://www.timberjay.com/stories/Up-North-Jobs,11138  I don’t always agree with Marshal, but is this case he says it … Read more